Recovery for Project Server 1.0.0634 Recovery for Project Server is a powerful data recovery software for corrupted Microsoft Project Server files (.MDF). Restores project information, recovers tasks, task relationships, resources. Recovers relationships between resources and tasks. Stores recovered data in Transact-SQL. Supports Microsoft Project Server 2003 and 2002 versions.
See also: recover corrupted project server, fix corrupted msprojectserver, repair damaged mdf, project server recovery, msprojectserver recovery, ProjectServerRecovery |  
|
OracleRecovery 2.0.0632 OracleRecovery is a comprehensive tool designed to recover data from damaged Oracle databases and backups. Special wizard-style interface gives users more control over the recovery process. OracleRecovery restores tables, fields, fields types and values, as well as all backup objects, including views, triggers, stored procedures etc. OracleRecovery 2.0 supports all moder Oracle versions, such as 10g, 7.3, 8i and 9i.
See also: OracleRecovery, damaged oracle, recovery oracle, oracle recover, corrupted oracle, oracle repair, oracle fix, oracle corrupt, oracle restore |  
|
Advanced Outlook Repair 1.0 Advanced Outlook Repair is a powerful Microsoft outlook recovery tool for Outlook 97, 98, 2000, 2002 and 2003. It can scan the corrupt or damaged personal folder files(.pst) and recover your mail messages, folders, posts, appointments, meeting requests, contacts, distribution lists, tasks, task requests, journals, notes in them. Moreover, it can recover deleted items, split oversized PST files, and recover encrypted PST files.
See also: contact, password, unerase, undelete, deleted, disaster, files, rescue, error, damaged, corrupted, corrupt, utility, tool, software, restore, contacts, oversized, notes, message, mailbox, mail, lost, key, file, microsoft, email, data, inbox, fix, recover, recovery, repair, pst, outlook |  
|
Kernel Paradox - File Repair Software 4.03 Kernel for Paradox - recovers corrupted .DB paradox database files corrupted due to unexpected system shutdown etc. Kernel for Paradox - corrupted database recovery software supported versions includes Supports file versions 3.0, 3.5, 4.0, 4.5, 5, 6, 7, 9 and 10 Paradox databases.
See also: db recovery, recovery paradox, db fix, paradox corrupt, fix paradox, Paradox Recovery, paradox fix, repair db, db repair, paradox repair, corrupted db, corrupted paradox, Paradox Repair Software, recovery db, recover paradox, db recover, recover db, paradox restore, db corrupt, db restore, paradox damaged |  
|
Recovery for BizTalk 1.0.0632 Recovery for BizTalk is a powerful data recovery software for damaged Microsoft BizTalk database files (.MDF). Retrieves information from both corrupted databases and backups. Recovers channels, ports, envelopes; processed documents and shared queues. Stores recovered information in Transact-SQL script. Supports Microsoft BizTalk Server 2002.
See also: recover biztalk server, biztalk recovery, recover corrupted mdf, biztalk fix, BizTalkRecovery, repair damaged biztalk, fix corrupted mdf, damaged biztalk, repair msbiztalk, recover msbiztalk, fix biztalk server, msbiztalk recovery |  
|
Advanced Photoshop Repair 1.0 Advanced Photoshop Repair(APSR) is a powerful tool to recover corrupt Photoshop image(PSD, PDD) files. It uses advanced technologies to scan the corrupt or damaged Photoshop image files and recover your data in them as much as possible, so to minimize the loss in file corruption. Currently APSR supports to recover PSD and PDD image files produced by all versions of Adobe Photoshop.
See also: data, files, rescue, error, damaged, corrupted, corrupt, utility, tool, file, photo, graphic, picture, image, fix, restore, recover, recovery, repair, pdd, psd, photoshop |  
|
Recovery for Outlook 1.5.0634 Recovery for Outlook fixes corrupted Microsoft Outlook files (.PST). Supports Microsoft Outlook 95/97/2000/XP/2003. Restores mail, contacts, calendar, tasks, notes. Recovers corrupted messages created in plain text, RTF and HTML format. Restores some of the message properties such as sender email, name, subject, etc. Recovers file attachments. Recovers 2Gb+ files. Easy to use, no special user skills required.
See also: recover Tasks, recover Calendar, fix damaged .PST, recover Contacts, corrupted .PST files recovery, Outlook recovery, damaged .ost, corrupted msoutlook, OutlookRecovery |  
|
MySQLRecovery 1.5.0635 MySQLRecovery is a powerful data recovery software for corrupted MySQL Server database files (.MYD and .MYI). Recovers table structure and data, restores indexes. Saves retrieved information in Transact-SQL script fit for quick database recreation. Easy to use, no special user skills required. Supports MySQL versions 5.x, 4.x, 3.x, 2.x and 1.x.
See also: fix myi, restore mysql, repair mysql, fix mysql, recover mysql, corrupted myi, corrupted myd, corrupted mysql, myi recovery, myd recovery, mysql recovery, fix myd, recover myi, recover myd |  
|
RiteRecovery 1.0.0638 RiteRecovery retrieves files from corrupted file systems: diskettes, hard disks, ZIP cartridges and other types of media, removable or non-removable. RiteRecovery saves the recovered files and folders into a folder on a safe drive. Is able to recover damaged disks with FAT12, VFAT12, FAT16, FAT32 and VFAT12 volumes created. CD/DVD file system recovery is supported as well including CDFS and UDV.
See also: recover data from damaged hard drives, retrieve data from damaged floppy, recover damaged ZIP, fix corrupted diskette, fix damaged floppy, retrieve data from corrupted CD and DVD |  
|
Advanced Outlook Repair 1.1 Advanced Outlook Repair is a powerful Microsoft outlook recovery tool for Outlook 97, 98, 2000, 2002 and 2003. It can scan the corrupt or damaged personal folder files(.pst) and recover your mail messages, folders, posts, appointments, meeting requests, contacts, distribution lists, tasks, task requests, journals, notes in them. Moreover, it can recover deleted items, split oversized PST files, and recover encrypted PST files.
See also: outlook, pst, repair, recovery, recover, fix, inbox, data, email, microsoft, file, key, lost, mail, mailbox, message, notes, oversized, contacts, restore, software, tool, utility, corrupt, corrupted, damaged, error, rescue, files, disaster, deleted, undelete, unerase, password, contact |  
|
SybaseRecovery 1.0.0639 SybaseRecovery is a powerful data recovery software for damaged Sybase database files (.DAT). Recovers tables, views and table data; indexes, primary keys, foreign keys, stored procuders and many other items. Recovered information is stored in Transact-SQL. Supports Sybase Adaptive Enterprise Server 12.x files. Easy to use, no special user skills required.
See also: restore sybase, repair sybase, fix sybase, corrupted sybase, repair dat files, fix corrupted sybase, restore dat, sybase recovery, restore damaged sybase |  
|
ZipRecovery 1.5.0639 ZipRecovery is a data recovery program for corrupted Zip archives (.ZIP). Supports all methods of ZIP compression. No special skills are required to use ZipRecovery. Simple user interface and full install/uninstall support make the program available to everyone. Available for all modern platforms: Windows 95/98/NT/2000/XP/2003 Server.
See also: zip recovery, ziprecovery, fix damaged .ZIP file, open corrupted .ZIP archive, Recover .ZIP archive, restore zip, fix zip, zip fix, recover zip |  
|
LotusNotesRecovery 1.0.0618 LotusNotesRecovery is data recovery program for Lotus Notes databases (.nsf). LotusNotesRecovery recovers damaged Notes/Domino databases on both server and client side. While recovering it stores data in dxl files for easy and convinient recreation of the faulty database. LotusNotesRecovery is able to recover such information as users' documents and metadata. Current version of the product supports Lotus Notes/Domino 6.0 and 6.5.
See also: recovery lotusnotes, lotus notes recovery, recovery lotus domino, lotus domino recovery, nsf recovery, recovery nsf, lotus recovery, fix lotus notes, repair lotus notes, lotus notes repair, nsf fix, fix nsf, corrupted lotus notes |  
|
Nucleus Kernel Word Document Repair Software 4.03 Nucleus Kernel Word is a advance easy to use word document repair software for corrupt .doc files. Software uses QFSCI technology to repair corrupt or lost word document files. It is one of the most widely used word document repair software by Home Users, Computer Technicians, System Administrators, R & D Institutes, Academic Institutes, Defence Establishments etc.
See also: word recovery, word repair, word document recovery, ms word recovery, word recovery software, word repair software, fix corrupted doc, doc recovery, corrupt doc recovery, doc repair, doc file repair, fix doc, corrupted doc repair, doc repair tool, doc repair utility |  
|
Nucleus Kernel Zip Repair Software 4.02 Nucleus Kernel Zip is a advance easy and user friendly corrupt zip repair software for damaged [.zip] files. Software uses QFSCI technology to repair corrupt or lost Zip files. It is one of the most widely used file repair software by Home Users, Computer Technicians, System Administrators, R & D Institutes, Academic Institutes, Defence Establishments etc.
See also: zip repair, repair zip, zip file repair, corrupt zip repair, zip recovery software, fix corrupted zip file, repair corrupted zip file |  
|
Advanced PSD Repair 1.2 Advanced PSD Repair(APSR) is a powerful tool to recover corrupt Photoshop image(PSD, PDD) files. It uses advanced technologies to scan the corrupt or damaged Photoshop image files and recover your data in them as much as possible, so to minimize the loss in file corruption. Currently APSR supports to recover PSD and PDD image files produced by all versions of Adobe Photoshop.
See also: photoshop, psd, pdd, repair, recovery, recover, restore, fix, image, picture, graphic, photo, file, tool, utility, corrupt, corrupted, damaged, error, rescue, files, data |  
|
Hard Drive Mechanic 2006 THE HARD DRIVE MECHANIC GOLD SPECIAL EDITION is a crash recovery utility for PCs that will not boot up or for drives that have become inaccessible. The Hard Drive Mechanic will allow you to fix hard drive crashes in a matter of minutes. Diagnose and recover crashes on FAT32 and NTFS hard drives. EASILY REPAIR: Corrupted partitions, invalid drive specifications, virus damage, disk boot failure... Backed by a 30 day, 100% Money Back Guarantee!
See also: hard drive recovery, data recovery, drive repair, hard drive mechanic, recovery software, repair utility, fat, ntfs, drive, mechanic, fix, disk, repair, recover, 6.6te.net, hard drive, recovery, software, lost, data, damaged fat, boot failure, pcsoftware1, invalid drive specification, boot failure, missing operating system, corrupted partitions, FAT32, Diagnose, Repair, errors, corrupt, boot, failure, partition, error, undelete, unerase, unformat, recover data, recover hard drive, repair drive, crashed hard drive, data recovery software, lost data recovery, drive recovery, disk bootdrive recovery, sector not found, fix hard drive, harddrive, hard drive data recovery |  
|
Recover iPod Files 2.0.1.5 Deleted iPod data recovery software recovers updated iTunes retrieve formatted audio video files like mp3, mp4, m4a, m4b, m4v, MPEG, AVI, WAV restore corrupted photos, pictures, images like JPEG, JPG, GIF, PNG, BMP, TIFF, RIFF. Tool support documents restoration from iPod Apple, iPod Shuffle, iPod Mini and iPod Nano undelete aa AAC 3gp file. Rescue and repair storage devices like flash memory, secure digital, compact flash, extreme digital cards.
See also: undelete, memory, songs, fix, repair, retrieve, tool, corrupted, formatted, digital, restoration, iTunes, shuffle, nano, mini, apple, file, video, audio, recover, images, photos, deleted, Software, recovery, data, iPod, pictures, rescue, restores |  
|
Digital Photo Recovery 2.0.1.5 Digital image recovery software restore unwanted deleted file from camera hard drive like multimedia memory card, secure digital, smart media and other removable devices. Utility retrieve unexpected lost data from formatted, corrupted or not detected media like mmc sD xD. Rescue software support restoration of MOV, AVI, RIFF, MPEG, GIF, BMP, TIFF, PNG, JPEG, JPG, JPG type picture video. Tools provide functionality with window XP 2K ME NT 98.
See also: USB, formatted, handy cam, MMC, xD, sD, fix, repair, corrupted, media, recover, storage, memory card, multimedia, files, data, Images, pictures, camera, software, video, MPEG, PNG, restore, BMP, GIF, JPG, JPEG, deleted, recovery, photos, digital |  
|
DBRecovery Desktop 2006.0644 DBRecovery Desktop fixes damaged databases. Restored are MS Access (.mdb), FileMaker Pro (.fp*), DBF files used by MS Visual FoxPro and other applications, Paradox databases (.dat) and Works files (wdb). Recovers table structure and data. Easy to use, no special skills required.
See also: database recovery, recovery filemaker pro, works recovery, corrupted ms access, repair dbf, paradox recovery, repair msaccess, restore mdb, recover filemakerpro, corrupted paradox, fix works database |  
|
|